Wednesday, July 8, 2009

Framing: 3rd Floor Loft has begun

Framing is underway on all floors. Here is a view from the second floor rear, looking toward the front.

The large opening is the span width for
  1. 1) my open loft which will be from approximately the metal "bridge" you see across the middle over to the right wall and
  2. 2) stairs from this floor up to the 3rd. These will be on the left hand side (as you are viewing here).
  1. More photos of this to come. Here I'm standing on a ladder 16' up from the ground floor. I feel fortunate to have snapped this photo successfully......

Monday, July 6, 2009

Eno Festival Weekend

Is it graffiti when you write "Hi Mom" on the sidewalk in chalk?

The weekend weather was perfect for the Eno Festival. 4 stages with bands playing rock, country, blues, and bluegrass. There were dozens of artist displaying their wares: pottery, painting, photography, metal sculptures and the like.



Kim and I rode bicycles up to the Eno, which made even the journey fun. Only 2 sketchy points in the trip; one crossing Duke Street and the other Roxboro Road. I've written to organizers asking them to consider posting their suggested bike route next year.

Kim is standing in front of a bike some person fashioned into a camel.


Here's the real reason for the Eno Festival. Entrance fees go to preserving and purchasing land in the Eno River basin. Here is a man-made dam with tree trunks used to climb and dive from.

Great fun.

New Term: LVL - Laminated Veneer Lumber

Last week the LVL's went into the first floor ceiling/second floor flooring.

LVL's are 6" thick products of laminated wood that spans the entire width of the building. They are heavy, approximately 400 lbs each, and are bolted to the walls on either side.

These new framing items will provide 1) support to existing framing and 2) material to support new structural material. In this photo, these 2 LVL's (light colored wood) will frame out the opening of the elevator shaft on the right hand side.

It was interesting watching how they were put in place. Metal forms were bolted to them while on the ground. Then, from above, they were hoisted up using eye bolts by a winch that was on the second floor with the wire material going through holes drilled in the floor. Because they expand the entire width, there was little clearance side-to-side. So, these were hoisted level otherwise they would wedge between the walls.

Similar framing material will be used on each of the next 2 floors.