Friday, November 13, 2009

Outlook: Showers Expected


The master bath and shower begin to take shape. A few weeks ago I showed the massive skylight going in above the shower. Now that the walls are going in you can get the whole view.

The framing at the top defines the entire bathroom space, with the framing at the bottom showing where the shower will be. On the left wall will be bathroom cabinets/mirror/sinks/lights. The doorway in the middle will be to the toilet (left as you walk in) and linen closet (right as you walk in).

On the wall in the shower space you see some plumbing rough-ins. The top one will be a shower head, and the 2 below will be controls for the shower heads; one for the "normal" shower head and the other for the rain head.

The walls around the shower will be glass. I think. We're still negotiating with vendors on price and as you know, this may change the design.

For what it is worth: this week the Triangle has seen 4"+ of rain and winds gusting to near 40 mph because of Tropical Storm Ida. I would not be using the rain head this week.....

No comments: