(click photos to enlarge)
The framing is complete and the flooring has been laid. The stairs are nearly complete.
This is an excellent shot of the 3rd floor. The opening nearest me will be the stairwell up and down. The framing on the left is for the closet (big). Just behind that where you see framing on the floor is the shower (big). The framing on the right will be a utility closet.
Can't wait to see the stairs.
Subscribe to:
Post Comments (Atom)
1 comment:
The closet has to be big enough to fit in, right?
Post a Comment